{"id":13374,"date":"2025-07-10T15:07:36","date_gmt":"2025-07-10T13:07:36","guid":{"rendered":"https:\/\/petro-center.lu\/?p=13374"},"modified":"2025-07-11T10:03:08","modified_gmt":"2025-07-11T08:03:08","slug":"bestcharge-in-gridx-two-first-fast-charging-stations-open-in-wickrange","status":"publish","type":"post","link":"https:\/\/petro-center.lu\/en\/bestcharge-sinstalle-a-gridx-deux-premieres-bornes-de-recharge-rapide-ouvertes-a-wickrange\/","title":{"rendered":"BESTCHARGE Expands to GRIDX: First Two Fast-Charging Stations Open in Wickrange"},"content":{"rendered":"<h3 data-start=\"499\" data-end=\"570\">A Strategic Step for Electric Mobility in Luxembourg<\/h3>\n<p data-start=\"572\" data-end=\"976\">Petro-Center, through its BESTCHARGE brand, is taking another step forward in the expansion of electric mobility by establishing a presence at the brand-new <a href=\"https:\/\/gridx.lu\/fr\">GRIDX complex<\/a>, located in Wickrange along the A4 highway. This exclusive partnership with the F\u00e9lix Giorgetti Group positions BESTCHARGE as the leading operator of charging infrastructure at this large-scale, multi-experience site.<\/p>\n<h3 data-start=\"983\" data-end=\"1045\">The first two 50-kW fast-charging stations are already in service<\/h3>\n<p data-start=\"1047\" data-end=\"1408\">Drivers can now use two DC fast-charging stations (50 kW) installed in the GRIDX parking lot. These stations can restore up to 80 % of range in less than 30 minutes, depending on the vehicle, making charging as simple as it is efficient during a lunch break, an event, or a stop at the business center.<\/p>\n<p data-start=\"1410\" data-end=\"1469\">But this is just the beginning. The full rollout will include:<\/p>\n<ul data-start=\"1470\" data-end=\"1656\">\n<li data-start=\"1470\" data-end=\"1563\">\n<p data-start=\"1472\" data-end=\"1563\">80 AC charging stations (22 kW) spread across the 7 floors of the parking garage and the NOTO hotel,<\/p>\n<\/li>\n<li data-start=\"1564\" data-end=\"1656\">\n<p data-start=\"1566\" data-end=\"1656\">Several additional DC charging stations, for fast and versatile charging.<\/p>\n<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h3 data-start=\"1663\" data-end=\"1744\">GRIDX: A Visionary Project with Sustainable Mobility at Its Core<\/h3>\n<p data-start=\"1746\" data-end=\"2103\">GRIDX is much more than just a place. It is an innovative ecosystem spanning over 100,000 m\u00b2, featuring a hotel, event spaces, a Motorworld center, retail stores, a digital museum, offices, and dining options. The phased opening began in July 2025, with Phase 1\u2014open to the general public\u2014scheduled for September 18, 2025.<\/p>\n<p data-start=\"2105\" data-end=\"2277\">Mobility plays a central role in this trend. By partnering with BESTCHARGE, GRIDX is committed to promoting more responsible, efficient, and accessible mobility.<\/p>\n<h3 data-start=\"2284\" data-end=\"2355\"><\/h3>\n<h3 data-start=\"2284\" data-end=\"2355\">BESTCHARGE: The charging network that\u2019s electrifying the Grand Duchy<\/h3>\n<p data-start=\"2357\" data-end=\"2542\">With more than 100 fast-charging stations already deployed in Luxembourg, BESTCHARGE is establishing itself as the <a href=\"http:\/\/petro-center.lu\/en\/bestcharge-card\/\">the nation's No. 1 private fast-charging network<\/a>. Developed by Petro-Center, the network offers:<\/p>\n<ul data-start=\"2544\" data-end=\"2952\">\n<li data-start=\"2544\" data-end=\"2599\">\n<p data-start=\"2546\" data-end=\"2599\">DC charging stations with power ratings of up to 400 kW,<\/p>\n<\/li>\n<li data-start=\"2600\" data-end=\"2704\">\n<p data-start=\"2602\" data-end=\"2704\">A single app and card providing access to more than 200,000 charging stations in Europe,<\/p>\n<\/li>\n<li data-start=\"2705\" data-end=\"2817\">\n<p data-start=\"2707\" data-end=\"2817\">Smart management of public and private infrastructure (businesses, local governments, third-party networks),<\/p>\n<\/li>\n<li data-start=\"2818\" data-end=\"2952\">\n<p data-start=\"2820\" data-end=\"2952\">A strong commitment to the local community, as evidenced by the recent openings in Remerschen, Mondorf-les-Bains, and Mertert.<\/p>\n<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h3 data-start=\"2959\" data-end=\"3016\">A Partnership of Excellence Among Committed Stakeholders<\/h3>\n<p data-start=\"3018\" data-end=\"3377\">The F\u00e9lix Giorgetti Group\u2019s confidence in BESTCHARGE confirms our ability to meet the technological, logistical, and environmental requirements of large-scale projects. This exclusive partnership, established through GRIDX, is part of a shared strategy to decarbonize mobility and enhance the user experience.<\/p>\n<div id='gallery-1' class='gallery galleryid-13374 gallery-columns-3 gallery-size-medium'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"200\" height=\"300\" src=\"https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX-200x300.jpg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX-200x300.jpg 200w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX-684x1024.jpg 684w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX-768x1150.jpg 768w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX-1026x1536.jpg 1026w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX-1368x2048.jpg 1368w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX-8x12.jpg 8w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX.jpg 1380w\" sizes=\"(max-width: 200px) 100vw, 200px\" \/>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<img decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX2-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX2-300x200.jpg 300w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX2-1024x683.jpg 1024w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX2-768x512.jpg 768w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX2-18x12.jpg 18w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX2.jpg 1377w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<img decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX3-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX3-300x200.jpg 300w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX3-1024x682.jpg 1024w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX3-768x511.jpg 768w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX3-18x12.jpg 18w, https:\/\/petro-center.lu\/wp-content\/uploads\/2025\/07\/GRIDX3.jpg 1377w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n<h3 data-start=\"3384\" data-end=\"3450\">Why choose BESTCHARGE for your charging needs?<\/h3>\n<p data-start=\"3452\" data-end=\"3745\">\u2714\ufe0f Power up to 400 kW for ultra-fast charging<br data-start=\"3512\" data-end=\"3515\" \/>\u2714\ufe0f 24\/7 availability on major routes and in strategic areas<br data-start=\"3578\" data-end=\"3581\" \/>\u2714\ufe0f An intuitive app for locating, starting, and paying for charging<br data-start=\"3651\" data-end=\"3654\" \/>\u2714\ufe0f A trusted partner for the installation and management of private or public charging stations<\/p>\n<h3 data-start=\"3752\" data-end=\"3825\"><\/h3>\n<h3 data-start=\"3752\" data-end=\"3825\">GRIDX x BESTCHARGE: A Partnership for the Future<\/h3>\n<p data-start=\"3827\" data-end=\"4161\">The arrival of the first BESTCHARGE charging stations at GRIDX embodies a modern vision of mobility, in line with the expectations of an urban, connected, and eco-conscious audience. It also sends a strong signal to the Luxembourg ecosystem: electromobility is on the rise, and Petro-Center is one of its key drivers.<\/p>\n<p data-start=\"4163\" data-end=\"4357\">\u27a1\ufe0f Are you a business, a developer, or a local government looking to install charging stations?<br data-start=\"4258\" data-end=\"4261\" \/><a href=\"http:\/\/petro-center.lu\/en\/contact\/\">Contact BESTCHARGE<\/a> and receive comprehensive support, from planning to operation.<\/p>","protected":false},"excerpt":{"rendered":"<p>Une \u00e9tape strat\u00e9gique pour la mobilit\u00e9 \u00e9lectrique au Luxembourg Petro-Center, \u00e0 travers sa marque BESTCHARGE, franchit un nouveau cap dans le d\u00e9ploiement de l\u2019\u00e9lectromobilit\u00e9 en s\u2019implantant au sein du tout nouveau complexe GRIDX, situ\u00e9 \u00e0 Wickrange, le long de l\u2019autoroute A4. Ce partenariat exclusif avec le groupe F\u00e9lix Giorgetti positionne BESTCHARGE comme l\u2019op\u00e9rateur de r\u00e9f\u00e9rence [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":13380,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_seopress_titles_title":"Bornes BESTCHARGE \u00e0 GRIDX : la recharge rapide s'invite \u00e0 Wickrange","_seopress_titles_desc":"Deux bornes BESTCHARGE de 50 kW sont d\u00e9sormais accessibles \u00e0 GRIDX Wickrange. D\u00e9couvrez comment Petro-Center acc\u00e9l\u00e8re la mobilit\u00e9 \u00e9lectrique au Luxembourg.","_seopress_robots_index":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-13374","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/petro-center.lu\/en\/wp-json\/wp\/v2\/posts\/13374","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/petro-center.lu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/petro-center.lu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/petro-center.lu\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/petro-center.lu\/en\/wp-json\/wp\/v2\/comments?post=13374"}],"version-history":[{"count":2,"href":"https:\/\/petro-center.lu\/en\/wp-json\/wp\/v2\/posts\/13374\/revisions"}],"predecessor-version":[{"id":13407,"href":"https:\/\/petro-center.lu\/en\/wp-json\/wp\/v2\/posts\/13374\/revisions\/13407"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/petro-center.lu\/en\/wp-json\/wp\/v2\/media\/13380"}],"wp:attachment":[{"href":"https:\/\/petro-center.lu\/en\/wp-json\/wp\/v2\/media?parent=13374"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/petro-center.lu\/en\/wp-json\/wp\/v2\/categories?post=13374"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/petro-center.lu\/en\/wp-json\/wp\/v2\/tags?post=13374"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}